INFORMATION ON ELECTRICITY RATES AND CHARGES
STANDARD CONTINUING TARIFF
The Standard Continuing Tariff is applicable to all electricity consumption in the following instances:
- As an interim tariff that will come into effect if, after your current Electricity Supply Agreement with AGL | Perth Energy has passed its “Contract End Date”, and you continue to use electricity without entering into a new Electricity Supply Agreement with AGL | Perth Energy; and/or
The Standard Continuing Tariff is as follows:
Prices exclude GST | Electricity Prices (Unbundled) | Electricity Prices (Bundled) | ||
---|---|---|---|---|
Until 30th September 2025 | From 1st October 2025 | Until 30th September 2025 | From 1st October 2025 | |
Peak Tariff | 18.00 cents/kWh | 18.00 cents/kWh | 40.00 cents/kWh | 45.00 cents/kWh |
Off-peak Tariff | 18.00 cents/kWh | 18.00 cents/kWh | 40.00 cents/kWh | 45.00 cents/kWh |
Daily Supply Charge | $4.98 meter/day | $4.98 meter/day | $9.98 meter/day | $9.98 meter/day |
Please note that the Standard Continuing Tariff is subject to change periodically as published by AGL | Perth Energy.
OTHER FEES & CHARGES
Electricity Account Service Fees | Prices including GST | Prices including GST |
---|---|---|
Until 30th September 2025 | From 1st October 2025 | |
Account Set Up Fee No charge for account set up, even if you’re switching or moving. |
$ 0.00 | $ 0.00 |
Bill Fee – Via Post Covers printing and posting costs |
$ 0.00 per bill | $ 0.00 per bill |
Bill Copy Fee – Via Post Covers printing and posting costs |
$ 0.00 per bill | $ 0.00 per bill |
Overdue Notice Fee – Via Post Covers printing and posting costs |
$ 0.00 | $ 0.00 |
Dishonour Fee Covers costs incurred when a cheque or direct debit payment is dishonoured |
$ 0.00 | $ 0.00 |
Late Payment Fee | $50 per statement | $50 per statement |
Interest on Overdue Accounts | Westpac corporate overdraft rate plus 2% per annum (per T&C’s) | Westpac corporate overdraft rate plus 2% per annum (per T&C’s) |
Credit Card Surcharge Covers credit card payment costs incurred by Perth Energy |
0.7% for MasterCard or Visa payment, 2.75% for American Express payment | 0.7% for MasterCard or Visa payment, 2.75% for American Express payment |
Electricity Services / Works Fees | Prices excluding GST Until 30th September 2025 |
Prices excluding GST From 1st October 2025 |
Please note that Electricity Services / Works are direct pass-through fees from the network operator. | ||
Special Meter Reading Pass-through fees from the network operator to perform a special read on a basic meter |
$ 23.60 (Rural) $ 5.45 (Urban) |
$ 23.60 (Rural) $ 5.45 (Urban) |
Meter Investigation and Test Pass-through fees from the network operator to remove and test a meter in a laboratory. This fee is refunded if the meter is found to be faulty |
$ 215.62 | $ 216.73 |
De-energisation | $ 71.11 | $ 71.47 |
Re-Energisation | $ 71.09 (Standard) $ 179.42 (urgent) |
$ 71.45 (Standard) $ 180.35 (urgent) |
If you require services or works that are not listed in the table above, please contact us for a quote specific to your site.
AGL | Perth Energy reserves the right to update, change or replace the rates at any time by posting updates and/or changes to our website.